Frequent backups in a tree-lined Santa Monica neighborhood with small children at home. TSR burst out 60 feet of cracked clay and pulled in new HDPE in a day.
A busy mother with young children was dealing with increasingly frequent backups. Her street is heavily treed, and the camera showed why: terra cotta pipe full of roots, with cracks throughout where the roots were stressing the joints.
With that much cracking, TSR recommended replacing the line by pipe bursting rather than lining it. The run was only about 60 feet and the work took a day. Several neighbors came over to watch the new pipe go in, and a few asked about having their own lines done.
Need the same result at your property in Santa Monica? Call TSR Trenchless at (310) 340-2515 or the form to request a free estimate. See more work on the TSR Trenchless verified installer profile, or compare all CIPP contractors serving Santa Monica.
A homeowner who had been snaking his line every six to eight months finally got a permanent fix: TSR hydro-jetted a root ball 23 feet out and lined the full 85-foot clay...
View projectA family with an elaborate built-in playground in the front yard could not excavate. TSR lined the 60-foot cast iron sewer beneath it without moving a single piece of equ...
View projectAfter 30-plus trouble-free years, a serious backup revealed root-cracked pipe along a long Arcadia lateral. TSR lined all 119 feet in one day.
View projectA property owner had a lining quote for 135 feet of patchwork sewer. TSR's camera found three different pipe materials and recommended bursting in a brand-new HDPE line i...
View projectA 20-unit Burbank condominium had backups on two separate 6-inch clay lines under mature landscaping. TSR burst one run and lined the other, reinstating all ten unit conn...
View projectA homeowner cleaning up after a basement backup wanted the sewer fixed without losing the trees over it. TSR burst in a new line the same day.
View project
“We engaged Bob and his team at TSR for work in Santa Monica to evaluate a roughly 120-foot sewer lateral installed around 1925. The line had multiple structural issues consistent with aging infrastructure, and there was an immediate problem at the city connection that, at first glance, appeared to require excavation into city property just…”